Villa in Puerto Andratx.
Installation of a centralized geothermal system consisting of a high-efficiency heat pump, a domestic hot water (DHW) storage tank, and an optimized hydraulic circuit for the building’s thermal distribution.

Property in El Toro.
Execution of an HVAC installation using a underfloor heating system, designed to ensure uniform thermal distribution and high indoor comfort.
The solution is based on the arrangement of piping circuits over insulated panels with an integrated fixing system, optimizing heat transfer and reducing energy losses.

Property in Porreras.
Execution of an external thermal plant based on an aerothermal system for the production of heating, cooling, and domestic hot water (DHW).
The installation consists of high-efficiency air-to-water heat pump units, integrated with a storage tank and hydraulic distribution network.

Costa de los Pinos.
Execution and organization of a technical room dedicated to the distribution and control of the home's hydraulic installations.
The installation integrates distribution manifolds, shut-off and balancing valves, filtration and pumping systems, as well as expansion vessels to ensure pressure stability in the circuits.

Technical Room for Thermal Production and Storage
Execution of a plant room for centralized thermal installations, consisting of a heat pump production system, storage tanks, and a hydraulic distribution network.
The installation integrates manifolds, pumping units, balancing valves, and expansion vessels, ensuring efficient and stable operation of the various circuits.

Low-Voltage Main Electrical Distribution Panel.
Execution and installation of the main low-voltage distribution panel (CGBT) for managing and protecting the building’s installations.
The system consists of multiple outgoing circuits, circuit breakers and residual current devices, as well as switching and control elements, ensuring safety and continuity of the electrical supply.










